Lunasol Logistics Lunasol Logistics

Customized Bin Handling AMR Robot Tote Shuttle Vehicle for Automated Sorting and Distribution Logistics

Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year

Product Description

📊

Basic Information

Automatic Grade
Automatic
Type
Filling and Sealing Machine
Driven Type
Electric
Material Type
Carbon Steel
Packaging
Cartons
System Type
Automated Storage and Retrieval System (ASRS/CTU)
Load Capacity
1000 Kg / 2200 Lbs
Max Height
up to 25m (High-Bay)
Aisle Width
~1600 - 2000 mm
HS Code
8422309090
📦

Packaging & Delivery

Package Size
200.00cm * 210.00cm * 190.00cm
Gross Weight
260.000kg
⚙️

Product Parameters

Category Specification Details
Core Specs System Type Automated Storage and Retrieval System (ASRS/CTU)
Load Capacity 1000 kg / 2200 lbs
Max Height Up to 25m (High-Bay)
Control System Integrated PLC + SCADA System
Structure Material S355JR / Q355B High-Strength Structural Steel
Surface Shot blasted, phosphated, and epoxy powder-coated
Fire Resistance Class A60 (Optional)
Performance S/R Machine Stacker Crane (Single-Mast or Double-Mast)
Traveling Speed 0-120 m/min (Horizontal), 0-40 m/min (Vertical)
Accuracy ±2 mm
📸

Detailed Photos

Frequently Asked Questions

What is the maximum load capacity for each location?
The standard load capacity is 1000 kg (2200 lbs) per location, though custom capacities can be designed to meet specific needs.
What industries are best suited for this ASRS system?
It is ideal for high-density environments such as cold storage, logistics and distribution centers, manufacturing plants, e-commerce hubs, and the automotive industry.
How high can the automated storage system be built?
The system supports a standard range from 6m up to 25m for high-bay storage applications.
What safety features are included?
The system includes advanced safety devices such as laser obstacle detection, emergency stop buttons, overload protection, anti-drop safety blocks, and safety light curtains.
What is the typical lead time for a standard system?
For standard systems, the lead time is generally between 30 to 60 days following the final design confirmation.
Is the system compatible with Warehouse Management Systems (WMS)?
Yes, the system is WMS integration ready, allowing for fully automated and unmanned warehouse operations.

Related Products